East Tampa - Tampa Neighborhoods
16974
page-template,page-template-full_width,page-template-full_width-php,page,page-id-16974,page-parent,bridge-core-2.4.6,qode-quick-links-1.0,ajax_fade,page_not_loaded,,no_animation_on_touch,hide_top_bar_on_mobile_header,qode-child-theme-ver-1.0.0,qode-theme-ver-23.1,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-7.9,vc_responsive

East Tampa

Want to stay in the loop on the latest project updates in East Tampa? Text easttampa to 74121 to opt in for text updates!

East Tampa

The City of Tampa’s Foundation for Tampa’s Neighborhoods Design Build project includes water, wastewater and stormwater improvements in multiple neighborhoods within the city’s limits as part of the Transforming Tampa’s Tomorrow initiative. These improvements may cause temporary inconveniences while construction activities are being performed. The city and their contractor are committed to minimizing these impacts and providing citizens with sustainable solutions that will enhance the quality of life for all residents.

Improvements planned for East Tampa

  • Completed in the Spring of 2024 – Wastewater improvements to East Tampa will include the rehabilitation of existing gravity sewers, including House Service repairs to City Right of Way where applicable.
  • Water improvements will include the replacement of water distribution pipelines.

Design & Construction Schedule

  • Design: Fall 2020 – Winter 2022
  • Construction: Spring 2022 – June 2025

Timeline

  • Fall 2024 – Summer 2025

Community Benefits

  • Improved water pressure and enhanced water quality
  • Improved fire protection for residential areas
  • Reduction in water and wastewater infrastructure breaks and backups
  • Improvements will incorporate sustainability and resiliency features throughout the neighborhood
  • Modernisation of the aging system
  • Rehabilitation of gravity sewers and manholes